Global Manufacturing Support

Factory Acceptance Testing (FAT) Witnessing

Independent witness testing, protocol review, functional verification, and punch list resolution before equipment leaves the manufacturer.

Verification Before Factory Gate Release

Factory Acceptance Testing (FAT) is the final quality gate before custom machinery, electrical control skids, or structural packages are packed and shipped. Discovering functional errors or non-compliances after international shipment causes severe project delays, costly site rework, and warranty friction.

Structive provides qualified technical personnel close to the manufacturing point to witness FAT procedures, verify operational performance against contract drawings and standards, and report defects before factory gate sign-off.

Factory acceptance testing and inspection verification

Pre-FAT Review

  • FAT procedure and test protocol review
  • Alignment with specifications & Australian standards
  • Test instrument calibration certificate audit

FAT Witnessing & Closeout

  • Physical witnessing of functional & pressure tests
  • Punch list creation and NCR tracking
  • Formal FAT report and release recommendation
Connected Workflow

Need help coordinating equipment delivery after FAT approval?

Structive can handle pre-shipment packing review, import documentation, and site delivery tracking.

Explore Procurement & Supply